Products
wedofloor-06High-solid-content general system
Product Details
Product features
Strong adhesion, good flexibility
Low solvent content, environmentally friendly and low pollution
Quick construction, easy cleaning, low cost
High strength, wear-resistant, waterproof, long-lasting durability
Scope of application
It is particularly suitable for industrial plants such as those for electrical appliances, electronics, machinery, food, medicine, chemicals, tobacco, feed, textiles, clothing, furniture, plastics, and sports and cultural products, as well as underground garages and other places.
| Performance | Technical Specification (GB/T22374-2018) | Test Result |
| Drying Time | ||
| - Surface Dry (h) | ≤ 8 | Conforms |
| - Through Dry (h) | ≤ 48 | Conforms |
| Hardness | ||
| - Pencil Hardness (scratch) | Negotiated | 3H |
| Abrasion Resistance (750g/500r) | ≤ 0.030 | 0.02 |
| Impact Resistance | ||
| - Heavy Load | 1000g steel ball, 100cm height, no cracks or peeling on the coating | Conforms |
| Anti-slip Property, Dry Coefficient of Friction | ≥ 0.50 | 0.55 |
| Water Resistance (168h) | No blistering, no peeling, slight discoloration allowed | Conforms |
| Chemical Resistance | ||
| - Oil Resistance (120# solvent gasoline, 72h) | No blistering, no peeling, slight discoloration allowed | Conforms |
| - Alkali Resistance (20% NaOH, 72h) | No blistering, no peeling, slight discoloration allowed | Conforms |
| - Acid Resistance (10% H₂SO₄, 48h) | No blistering, no peeling, slight discoloration allowed | Conforms |
| Coating Layer | Material Model | Packaging Specification | Mixing Ratio | Single-pass Usage (kg/m²) | Single-pass Thickness (mm) |
| Primer | WEDO-H2201 High-solid Universal Primer | 20KG / 10KG | 2:01:00 | 0.10–0.15 | 0.06–0.09 |
| Mortar Layer | WEDO-H2202 High-solid Universal Mid-coat | 25KG / 5KG | 5:01:00 | 0.25–0.30 | 0.25–0.30 |
| Putty Layer | WEDO-H2203 High-solid Universal High-gloss Topcoat | 20KG / 5KG | 4:01:00 | 0.10 | 0.07–0.10 |
| Topcoat | WEDO-2203 High-solid Universal High-gloss Topcoat | 20KG / 5KG | 4:01:00 | 0.20–0.25 | 0.16–0.20 |
Notes
During the construction and drying process of H2201/H2202 materials, there must be no visible water on the surface;
The stirring time during the H2201/H2202 process must be no less than 1 minute. If the stirring is not uniform, it may cause coating defects such as not drying, peeling, and delamination;
The single coat application amount of H2201 is not recommended to exceed 0.2kg/m2, and the single coat application amount of H2202 is not recommended to exceed 0.5kg/m2. This may lead to a decrease in adhesion and even the appearance of paint film detachment;
The construction environment temperature for the topcoat is 5 - 30℃, and the relative humidity of the air should be less than 80%; If the humidity is too high, it may cause whitening, loss of gloss, and even a decrease in adhesion;
The drying time must be strictly followed as per the requirements. Proceeding to the next process too early may result in problems such as blistering and stickiness;
Please operate the construction strictly in accordance with the instructions
Technical Statement
To ensure that your project can select the appropriate floor system, please consult our professional technical advisors. For special colors or effect designs, we can manufacture them according to your requirements. Our company can form design schemes of different specifications (thickness, effect, etc.) through flexible matching and combination of various products to meet the personalized requirements of all kinds of customers.
| Process Name | Detailed Practices and Requirements | Single-pass Usage (kg/m²) |
| Base Treatment | 1. Base strength: No less than C20. | / |
| 2. Base flatness: ≤5mm when measured with a 2m straightedge. | ||
| 3. Base dryness: Surface moisture content < 8%. | ||
| 4. Repair hollowing and cracks on the ground in advance. | ||
| 5. Fully grind the concrete base. | ||
| Primer Coat | 1. Use WEDO-H2201: Mixing time shall be no less than 3 minutes. | 0.10–0.15 |
| 2. Apply by roller or brush. | ||
| 3. Use a brush to apply at door edges, corners, and around equipment. | ||
| Mid-coat Mortar Layer | 1. Use WEDO-H2202: Mixing time shall be no less than 3 minutes. Add quartz sand (generally 80–120 mesh) at a recommended ratio of paint:quartz sand = 1:0.2–1, and mix evenly. | 0.25–0.30 |
| 2. Scrape with a trowel to form an integral layer. The number of passes can be adjusted as needed. | ||
| 3. After curing, grind and remove dust to ensure no trowel marks. | ||
| Putty Layer | 1. Use WEDO-H2203: Mix the base and curing agent in the specified ratio, then add an appropriate amount of filler (heavy calcium, talc powder, etc.) at a paint:filler ratio of 1:0.1–0.5, and mix evenly. | 0.1 |
| 2. Scrape evenly with a trowel, focusing on filling defects such as pinholes and air holes. The number of passes can be adjusted as needed. | ||
| 3. After curing, fully grind and remove dust. | ||
| Topcoat Layer | Use WEDO-H2203: Mix the base and curing agent in the specified ratio and stir evenly. Dip the paint with a roller and apply evenly, ensuring a uniform coat without missing any areas. | 0.20–0.25 |
Construction section

Construction conditions
Air temperature: 5℃ – 30℃
Relative humidity: < 80%
Moisture content on substrate surface: < 8%
The construction site should have good ventilation
Dew point temperature: The substrate and uncurdled coating substrate must be 3℃ or more higher than the dew point temperature
To reduce the risk of condensation or frosting on the floor coating, oily floors must be thoroughly cleaned; otherwise, it may affect the even application of the coating.
Indonesian
Malay
Vietnamese
Slovenian
Slovak
Latvian
Bosnian
Icelandic
Ukrainian
Georgian
Serbian
Croatian
Belarusian
Romanian
Estonian
Hungarian
Czech
Catalan
Norwegian
Lithuanian
Albanian
Hindi
Italian
Finnish
Arabic
Danish
Bulgarian
Thai
Polish
Swedish
Greek
Portuguese
Dutch
Turkish
Russian
Deutsch
French
Korean
Japanese
English